Project

Project Introduction

Lumiere Fuchu

Lumiere Fuchu

A complex of civic halls and a central library opened in the city center

With a functional and clear facility configuration featuring a civic center on the lower levels (1st and 2nd floors) and a central library on the upper levels (3rd to 5th floors), we have achieved a bustling civic center and a calm central library.

Construction and operation using the PFI method

It was built using the PFI method. It adopts the BTO (Build Transfer Operate) method, with a project period of approximately 17 years (approximately 2 years for design and construction, and approximately 15 years for maintenance and operational services).

A facility that blends harmoniously with its surroundings and blends into the greenery

The exterior design was carefully considered to respect the privacy of the surrounding residential areas, such as by setting back the volume or blocking the view with balconies and shutters. Furthermore, by preserving existing trees and planting new cherry trees that were felled during demolition work, the city has inherited the lush greenery of the city.