Project

Project Introduction

Kanto Rosai Hospital

Japan Organization of Occupational Health and Safety Kanto Rosai Hospital

While operating the existing hospital, a complete renovation of the entire premises was carried out.

The redevelopment plan required the existing hospital on the site to be operated while construction was carried out. The construction, which was carried out in five stages, required ensuring the safety of hospital operations above all else.

Create space through a land use master plan for the future

In the redevelopment plan, by creating a future master plan for the site where the existing building was built and had become too small to expand, we secured an open space (parking lot) on the east side of the site as a future growth and renewal opportunity.

Design changes add the latest features

In line with the original basic policy, we have successively made design changes to add and update new technologies and features, such as seismic isolation structure, ensuring a 2.7-meter corridor width in the wards, ensuring 8 square meters per patient room, accommodating day-surgery procedures, reducing the number of beds from 660 to 610, and converting the outpatient clinic into a disease-specific center. As a result, it has transformed into a state-of-the-art medical facility.